Friday 29 August 2014

Survey - refitted floor under the engine beds



Pictures showing the replacing of the bolts for the last galvanised floor. We have had not enough time on the tight launch schedule to send the strap floor off to be re-galvanised so therefore it was blasted and covered in epoxy. This is the last major structural point on the survey from three years ago that needed to be tackled. I am pleased it is now done.

No comments:

Post a Comment